سلام وقتتون بخیر، ارسال به شهرستان هم دارید؟چه مدت زمان میبره تا ارسال شه؟
GPU enablement package WARNING: To cut back the risk of particular personal injury, electric shock, or harm to the machines, eliminate the ability wire to eliminate electric power within the server. Pressing the Power On/Standby button doesn't shut off method energy fully. Portions of the facility offer and a few inner circuitry keep on being active until AC energy is taken out. Page eighty three Put in the GPU retention clips on to the air baffle. Clear away the typical heatsinks. Install the superior-functionality heatsinks. Hardware options installation 83... Site eighty four Put in the air baffle.
Warning: Electrostatic discharge can problems electronic components. Be certain that you are effectively grounded before beginning this treatment.
They can be a solid option for applications calling for dynamic workloads, for example high overall performance databases and cloud-primarily based computing. And they are able to even be employed for Major Information apps, which refers to procedures that Assemble extraordinary amounts of facts. This normally contains a variety of simulation and analytical purposes.
انعطافپذیری و مقیاسپذیری قابلیتهای ارتباطی سرور، ادغام آن را در زیرساختهای موجود آسانتر و سریعتر میکند و به شما این امکان را میدهد تا تنظیمات را تا حد امکان مطابق با وظایف خود بهینه کنید.
Clever spots feasible disk drive failures in advance of they reach catastrophic levels, permitting for replacement prior to the worst takes place. This can be Along with HP's dynamic sector restoring engineering, which operates frequent qualifications scans on drives and remaps poor sectors to protect data balance.
You may be wondering wherever another two SFF drives go. HP has redesigned the PSUs by creating them 20 for every cent scaled-down and fitted them side by aspect at the again Therefore the Room above can be utilized for two further hot-swap drives.
ذخیره نام، ایمیل و وبسایت من در مرورگر برای زمانی که دوباره دیدگاهی مینویسم.
HP hasn't carried out absent with FlexibleLOM It is really just moved the connector more than to the opposite facet. You can enhance everytime you want and HP presents quad Gigabit and twin fibre or copper 10GbE mezzanine cards.
Increase the server through the rack. Soon after carrying out the set up or upkeep procedure, slide the server again to the rack, and after that push the server firmly into the rack to protected it in place.
نشانی ایمیل شما منتشر نخواهد شد. بخشهای موردنیاز علامتگذاری شدهاند *
Ability up the server ("Powering up the server" on website page 26). 3-slot PCI riser cage choice WARNING: To scale back the risk of private damage, electric shock, or harm to the tools, eliminate the power cord to eliminate electricity in the server. Urgent the ability On/Standby button will not shut off technique electric power fully.
When putting in multiple server, you may need to work with supplemental energy distribution units to safely and securely deliver power to all gadgets. Website page 38: Rack Warnings
به علاوه با انتخاب درست پاور سرور اچ پی، امکان به دام افتادن انرژی اضافی در سرور کاهش مییابد.
اچپی برای این کار، استفاده از دو پورت ۱۰ گیگابیتی را پیشنهاد داده click here است.